students and parents
community
employees
CONSTRUCTION SERVICES

DIRECTORY
Don Pool, Executive Director - Construction Services 972-882-7419
Paula Lambright, Administrative Assistant 972-882-7390
Susan Pedlar, Construction Coordinator 972-882-7386
C.W. "Buddy" Ennis, Field Supervisor 972-882-7386
Silvia McGee, Construction Secretary 972-882-7361

 

Advertisements for Bids

Mesquite Independent School District, Mesquite, Texas

 Agnew Middle School Phase 3 Addition 

 SECTION 00 11 13   WRA ARCHITECTS, INC. ADVERTISEMENT FOR BIDS 

Separate sealed bids for the General Construction of Agnew MS Phase 3 Addition for the Mesquite Independent School District, located on School District property, Dallas County, Texas will be received by the Superintendent of Schools and the Construction Manager at Risk in the offices of the Construction Manager, Pogue Construction, Inc. located at 1512 Bray Central Drive, Suite 300, McKinney, TX 75069, until 2:00 p.m., July 18, 2017, and then opened and evaluated. No prices or quantities will be read publicly. Bids faxed to Pogue Construction, Inc. prior to the time noted above will be accepted. 

Pogue Construction, Inc. Phone Number -- 972.529.9401 

Fax Number -- 972.529.9406 

Email – bid@pogueconstruction.com 

The Information for Bidders, Bid Form, Form of Contract, Plans, Specifications and Forms of Bid Bond, Performance and Payment Bond, and other contract documents may be examined at the following: 

 

Office of the CM at Risk - Pogue Construction 

1512 Bray Central Drive, Suite 300, 

McKinney, Texas 75069 

(972) 529-9401/ Fax (972) 529-9406 

 

Office of WRA Architects, Inc. 

12377 Merit Drive, Suite 1800, 

Dallas, TX 75251 

(214) 750-0077 

 

McGraw Hill - Dodge Plan Rooms 

(Dallas and Fort Worth) 

9155 Sterling, Suite # 160, Irving, TX 75063 

(800) 328-4542 or (972) 819-1402 

 

CMD (formerly Reed Construction Data) 

(800) 763-3534 

I Square Foot (AGC Dallas) 

14305 Inwood Road 

Dallas, TX 75244 

(888) 601-5761 or (800) 364-2059 

 

DFW Minority Business Council Plan Room 

2710 Stemmons Fwy #900 (North Tower), 

Dallas, TX 75207 

(214) 630-0747 / Fax (214) 637-2241 

 

Copies may be obtained by the Bidders at the office of the CM at Risk upon deposit of $100.00 for each full set of plans and specifications. Electronic PDF copy of drawings and specs will also be available from the CMAR. Contractors may obtain one (1) printed set upon refundable deposit. Drawings and specs will be available after 2:00 p.m. on Friday, June 16, 2017. Any unsuccessful bidder upon returning such complete sets promptly and in good condition within 25 days after bid date to the CM at Risk’s Office will be refunded his deposit; and any non-bidder upon so returning such sets will be refunded his deposit less the cost of reproduction. The Architect and Construction Manager at Risk in no way shall be responsible for retrieval of plans from other locations. 

A Pre-Bid Conference will be held at 2:30 p.m., July 6, 2017, in the Agnew Middle School cafeteria located at 729 Wilkinson Drive, Mesquite, TX 75149. Attendance is encouraged by an administrative representative of the company or corporation submitting a bid as a Sub-contractor for the following work; 

Electrical, Structural Concrete, Paint, Drywall and Acoustical, Masonry, HVAC, HVAC Controls, Plumbing, Electrical, and Media Systems. 

All Sub-Contractors for the above listed work shall prepare and submit to the Owner, one day prior to the time of the Receiving of Bids the Bidder Qualifications Section 00 43 36 showing evidence that the Sub-Contractor has successfully completed work on projects of similar size and scope, utilizing Mechanical, Electrical, Controls, and Media Systems equal to those specified. 

Failure to be represented and to submit a completed Contractor Information Section 00 43 36 at the receipt of bids may eliminate a Sub-Contractor for the above trades from consideration for work on this project. 

The Owner reserves the right to waive any informalities and to reject any or all proposals. 

RELATED LINKS:

Landowner's Bill of Rights

Declaración de Derechos

2016 Capital Improvement Project 

September 2016 Capital Improvement Project 

2017 Construction Bid For Agnew Middle School